A meticulous forest sanitation was made in this area and the jogging track was rehabilitated. In several portions it was necessary to loosen the soil, the perimeter retaining wall was rehabilitated, and with the help of the Miguel Hidalgo district, sidewalks were renovated. The park’s total renovation can be appreciated thanks to the street lighting system, the walkways and the access ramps for the disabled. In addition, a perimeter irrigation network was installed, and urban furniture such as benches, trash cans, and signage were placed.