Actions Taken:
- Maintenance of the library, orchidarium, domino pergola, and restrooms.
- Rehabilitation of exterior lighting and localized lighting on monumental trees.
- Installation of ramps for people with disabilities, stainless steel handrails, new Chapultepec-style benches, as well as tables and chairs.
- Implementation of a stormwater drainage system to prevent flooding.
- Pavement repairs.
- Conducted 169 tree removals and 53 prunings.
- Application of waterproofing over more than 850 m².
- Replacement of over 3,000 light bulbs and installation of 166 light fixtures.
- Planting of more than 4,000 m² of grass.
- Replacement of 40 classic benches.
- Installation of 50 tables and over 600 chairs.
- Planting of more than 90,000 ornamental plants covering an area of 8,400 m².