Mobility Axis

2015

Mobility Axis

Actions Taken: 

  • Part of the Master Plan of the Second Section, designed by architect Mario Schjetnan, this mobility project organized and structured circulation throughout the area, prioritizing pedestrians 
  • Construction of a 3.5 km exclusive circuit for cyclists and a separate 3.5 km circuit for runners.
  • Construction of a dedicated lane for internal public transport.
  • Construction of two lanes for motor vehicles.
  • Creation of seven plaza streets, integrated with rehabilitated walkways and new pedestrian routes, ensuring free access for all visitors. 
  • Resurfacing of 39,500 meters of circuits and adjacent streets.
  • Construction of 16,500 m² of sidewalks.
  • Recovery of 15,000 m² of green areas.
  • Planting of 418 jacaranda trees.
  • Installation of 205 solar LED lights.
  • The design was structured around defined lanes for pedestrians, recreational internal transport, motor vehicles, cyclists, runners, and landscaping.
  • Total investment of 90 million pesos, funded by the Government of Mexico City in collaboration with the Fideicomiso Pro Bosque de Chapultepec and the Citizen Steering Council.

IMG_2769-baja IMG_2771-baja IMG_9307-baja IMG_5755-baja IMG_9244-baja IMG_9777-baja IMG_9778-baja IMG_9785-baja
en_USEnglish