Lake Restoration

2005

Lake Restoration

Actions Taken:

  • Project of the First Section Master Plan by architect Mario Schjetnan.
  • Cleaning and dredging.
  • Desilting operations.
  • Removal of trash from the lake beds as well as accumulated sediment.
  • Installation of aerators and recirculation circuits.
  • Construction of new hydraulic and electrical infrastructure.
  • Creation of a monumental waterfall next to the dock to oxygenate the water.
  • This project has improved the flow, volume, and water supply arriving from the treatment plant to the lakes, prevented leaks, and ensured sufficient water for irrigating the green areas.