Actions Taken:
- Project of the First Section Master Plan by architect Mario Schjetnan.
- Cleaning and dredging.
- Desilting operations.
- Removal of trash from the lake beds as well as accumulated sediment.
- Installation of aerators and recirculation circuits.
- Construction of new hydraulic and electrical infrastructure.
- Creation of a monumental waterfall next to the dock to oxygenate the water.
- This project has improved the flow, volume, and water supply arriving from the treatment plant to the lakes, prevented leaks, and ensured sufficient water for irrigating the green areas.