Actions Taken:
- Installation of a public restroom module.
- Rehabilitation of walkways along Av. Gandhi.
- Construction of new pedestrian walkways connecting to the water mirror.
- Construction of the Tamayo parking lot and pedestrian access along Av. Gandhi sidewalks.
- Installation of a children’s playground, pergola with picnic tables, and resting areas.
- Installation of exterior lighting, service ramps, landscaped areas with mounds, and grassed plazas.
- Installation of an irrigation system.
- Placement of urban furniture, including benches and trash bins, as well as signage.